Setup Menus in Admin Panel

  • No products in the cart.

Bridge that Collapsed Six Hours After Opening was Built Without Geotech Investigation

The Reeve of the rural municipality (RM) of Clayton says the bridge that collapsed six hours after it opened was built without having geotechnical investigation done on the riverbed it stood on. A bridge building expert calls that approach “irregular.”

The Dyck Memorial Bridge, located in the RM of Clayton about 300 kilometres east of Saskatoon, collapsed Friday shortly after it was opened.

Source

10/03/2018

Join us this Thursday afternoon for a special Engineering Structure webinar:
Dos & Don’ts In Steel And Connection Design.
Starts 2pm ET
https://www.pdhsource.com/course/live-webinar-dos-donts-in-steel-and-connection-design/

We have put together our favourite #Engineering themed #podcasts for you. You're welcome 😉 #fridayfeeling https://www.borntoengineer.com/resources/top-engineering-podcasts-stem-podcast-list-top

ACCEPTANCE GUARANTEE


ncees

PDH Source engineering courses & live webinars meet NCEES Guidelines for Professional Engineer licenses renewal in all 50 states.

PDH Source will refund your money if the PDH credits you earn are rejected by your state board for any reason.

top
Copyright 2019 · All Rights Reserved PDH Source, LLC 513 E- Main Street # 981 Charlottesville, VA 22902 USA